Monday 12 June 2017

Complete Master Bedroom Refurbishment - Plastering - Drywall - Thermal Acoustic Insulation

One of our ongoing projects in Tattershall Lincolnshire has just had the master bedroom completely refurbished.

The project included removal of existing Lime Plaster back to the brickwork, repairs to the brickwork to stabilise it, framing out the entire room to plumb, installation of thermal insulation to 3 walls, installation of acoustic insulation to an adjacent wall, installation of drywall throughout, upgrade to new double 2.1A USB Socket Outlets, upgrade to remote ceiling fan, new trims, architraves and skirtings.

Handy Andy Ruskington 07504 50 50 89